Case Studies

  • 07 Apr 2010

    Resin anchors fixes noise barriers | Case Studies

    A joint study by the University of Padua and fischer Italy about the fatigue performance of threaded rods fixed in concrete with fischer epoxy resin FIS EM shows positive results.

  • 24 Mar 2010

    Colour light installation in Seville’s Carthusian monastery | Case Studies

    The modern art of the HELIOS colour installation by the Stuttgart artist rosalie in the Gothic Carthusian monastery of Seville met the historical architecture of the 16th century from October 2008 until January 2009 – and the fischer group of companies of Waldachtal created the link between space and time.

  • 24 Mar 2010

    Germany’s first mobile organ inaugurated at the Alpirsbach monas | Case Studies

    Christmas 2008 saw Germany’s first mobile organ hover on air cushions through the Alpirsbach monastery church. To keep it on track, a mobile guide rail holds the monumental wood sculpture on course. The fischer group of companies of Waldachtal developed a unique anchoring construction for mounting and dismantling the guide rail in no time.

  • 16 Dec 2009

    Special solution with FHB dynamic | Case Studies

    A new city tunnel is being built in Malmö, Sweden’s third largest city. A special design of the fischer Highbond anchor FHB dynamic is used for fixing the brackets for the railing in the maintenance and service walkways.

  • 07 Apr 2009

    Bomb-proof anchors | Case Studies

    Highbond anchors have played an important role in recent tests carried out in the UK designed to develop blast-proof glazing solutions. The tests were carried out by specialist glazing systems company Wrightstyle Ltd at an RAF base in the north of England, as part of an ongoing development programme for high security glazing systems.


box1

News

  • 12 May 2015

    Anchor Volume Estimator

    This app quickly calculates the number of cartridges of  Anchoring Adhesive necessary to complete your specific installation.

  • 03 Jan 2014

    Professional brickwork restoration

    The VBS-M is approved for application in the brick center as well in the mortar joints of the brickwork. It is especially suitable for restoration in which the insulation system is post applied to the brickwork.

  • 03 Jan 2014

    Without the need to clean out

    The advantages of this innovation have direct and practical effects on the craftsmen's work: as much as 40 percent less time from setting the drill hole to setting the anchor

archive